Abstract
In order to integrate products of subordinate units and extend the use of new energy, a group company has built a micro-grid system composed of wind power, photovoltaic power and energy storage units, which loads at a certain place in Beijing. The system has completed the 240 hours(240h for short) trial operation of micro-grid and achieved good operation data. This paper introduces the architecture of the micro-grid, analyzes the 240h trial operation data, and discovers key points of designing the micro-grid.
Keywords Wind power generation, Photovoltaic power generation, Energy storage, Load, Micro-grid, Green energy
Copyright ©
Energy Proceedings